Reversible Street Pilots Scaled Successfully
Temporary street reconfigurations piloted, evaluated, then made permanent; low-cost reversibility reduces political risk, accelerates AV-ready infrastructure iteration
Conceptual Framework for Ch.8
Street space reallocation pilots—when designed with clear exit criteria, reversible modifications, and genuine community engagement—can scale to permanent systems while maintaining public support. Four case studies show conditions under which temporary pilots became permanent policy.
Case 1: Oslo City Centre Pedestrianisation (2015–2019)
Pilot Phase
- Timeline: Declared 2015; piloting began 2017
- Initial scope: Six pilot trials removing ~300 parking spaces in central Ring 1
- Trial locations: Dronnings gate, Fridtjof Nansens square, and others
- Design: Reversible; pilot duration ~1–2 years per location before expansion decisions
Expansion (2017–2019)
- Phase 1 (2017): 300 parking spaces removed in Ring 1
- Phase 2 (2018): Major expansion; traffic routes altered; several streets closed to vehicles
- Total removal: ~800 parking spaces removed city-wide by 2019
- Duration: Full rollout completed within 2 years
Measured Outcomes
- Car traffic reduction: 28% decrease in inner-city car traffic
- Pedestrian activity: 10% increase in pedestrian volume in city center year-over-year
- Public support: 75% support for overall goal (3 of 4 residents) by completion
- Key factor: Strong early public acceptance despite initial skepticism
Governance Mechanism
- City Council declaration (2015) set clear political mandate
- Pilot trials allowed adaptive management; locations adjusted based on early feedback
- Community engagement emphasized quality-of-life framing (street life, culture, events) rather than abstract sustainability claims
- Reversibility: Some measures (e.g., temporary bollards) could be removed within weeks; public knew this
Scaling Conditions
- Political mandate at top: City government committed before pilots; not consensus-driven
- Rapid iteration: Multiple pilots in parallel, not sequential; faster feedback
- Concrete benefits visible: 10% increase in pedestrians and 28% traffic reduction were measurable within 1–2 years
- Cultural fit: Oslo already had car-skeptical population; not fighting strong car culture
- Reversibility communication: Public knew changes were not irreversible, reducing opposition
Application to CAM Governance
- Pilot phases with clear metrics (e.g., “If CAM adoption reaches X% market share, curb lane will be converted to X use”) can gain public acceptance
- Cities should announce expansion criteria in advance, not post-hoc, to build credibility
- Temporary infrastructure (painted curb lanes, movable bollards) less politically contested than permanent removal
Sources:
- CityChangers: Oslo Street Parking Reversal
- ScienceDirect: Street-Space Reallocation in Oslo
- TheCityFix: Oslo Zero Fatalities Strategy
- EU Urban Mobility Observatory: Oslo Active Transport
Case 2: Barcelona Superblocks (Pilot→Expansion, 2016–Present)
Pilot Phase
- Timeline: Pilot launched ~2016; initial evaluation 2017–2019
- Scope: Sant Antoni superblock (pilot #1); Horta neighborhood (pilot #2)
- Design: 9-street perimeter reducing through-traffic; local traffic allowed; speed limits 10–20 km/h
- Reversibility: Could be redesignated within months if needed
Evaluation Methodology (Pre-Post)
- Health survey: 1,200 residents, pre-post design
- Environmental measurements: NO₂, PM10, PM2.5, black carbon at multiple locations
- Pedestrian activity: System for Observing Play and Recreation in Communities (SOPARC)
- Walkability assessment: Microscale Audit of Pedestrian Streetscapes (MAPS)
- Traffic injury data: Injury rates pre-post
Pilot Outcomes (Sant Antoni)
- Air quality: NO₂ down 25%; PM10 down 17%
- Noise: Daytime noise reduced 4.1 dB; nighttime 5.3 dB
- Pedestrian comfort: 60%+ residents felt more comfortable walking interior streets
- Accessibility: Improvements for strollers and people with reduced mobility reported
- Health projection: If expanded city-wide, estimated 700 deaths per year prevented
Expansion Plans
- Target: 500 superblocks by 2030 (currently ~10 active/piloted)
- Status: Scaling from pilot phase to city-wide program based on demonstrated results
- Political backing: Strong city government commitment to expand despite car-culture opposition
Governance Mechanism
- Evidence-first approach: Rigorous pre-post evaluation before expansion decisions
- Transparent metrics: Published health/environmental data built credibility for further expansion
- Incremental scaling: Phased rollout (superblock by superblock) not city-wide mandate
- Community feedback loop: Early pilots informed design of subsequent blocks
Scaling Conditions
- Rigorous measurement: Health and environmental data made expansion politically defensible
- Health framing: CO2 reductions alone would not have driven expansion; health benefits (700 deaths/year prevented) was the key political driver
- Reversibility: Superblocks are not permanent infrastructure removal; traffic diversion could be reversed
- Incremental scale: Expansion one block at a time, not wholesale; easier to adjust course
- City-wide vision: Department of Urban Ecology framed superblocks as part of larger mobility transformation, not isolated pilot
Application to CAM Governance
- Metrics matter: CAM governance should define measurable success criteria (e.g., “If CAM reduces total vehicle-miles by X%, curb will be repurposed”) before pilot
- Health/equity framing: Environmental and health benefits, not just efficiency or technology, drive public acceptance
- Reversibility design: Curb lanes, loading zones can be repurposed incrementally; full commitment not required upfront
Sources:
- PMC/NIH: Environmental & Health Effects of Barcelona Superblocks
- WHO: Barcelona Urban Design for Health
- Transport Lexicon: Barcelona Superblocks
- PMC: Study Protocol Salut Als Carrers
- OneEarth: Barcelona Superblocks Expansion
- COE Bank: Barcelona Superblocks Thematic Review
Case 3: London CS11 Cycle Superhighway (Contested Pilot)
Project Overview
- Route: East-West cycle corridor through central London (Westminster, Camden)
- Scope: Protected cycle lanes, segregated from traffic
- Timeline: Consulted 2016; scheduled construction 2018; indefinitely on hold as of 2024
Pilot Status & Opposition
- Consultation (2016): 60% of respondents supported the scheme
- Opposition: Westminster Council opposed; Camden qualified support with reservations
- Petition objections: 3,873 objections lodged by petition; not counted in TfL’s official consultation summary
- Legal challenge: Westminster sued TfL; courts refused TfL’s appeal in ~2019–2020
- Current status: Project indefinitely on hold (no pilot ever conducted)
Relevant Data (from Broader Cycle Superhighway Studies)
- Other CS routes: Significant increase in cycle hire usage in effect areas
- Docking stations within effect area: +27.1% average ridership increase
- Trips with both origin/destination in effect area: +73.2% increase
- Safety outcomes: London cycle superhighways associated with reduced collision rates
Why This Case Matters (Negative Example)
- No reversible pilot: Project moved to consultation→plan without low-cost temporary trial
- Opposition crystallized early: Lack of reversible pilot meant opposition framed as principle-based, not evidence-based
- Legal vulnerability: Opponents used legal process to block; no trial data to defend design
- Lessons: Temporary painted pilots before full buildout would have:
- Allowed Westminster to test claims before permanent decision
- Provided empirical evidence to counter speculation
- Reduced perceived irreversibility (key fear driver)
- Given Westminster & TfL common ground for compromise
Application to CAM Governance
- Do not skip pilots: Announcing full CAM infrastructure plans before temporary trials risks opposition crystallizing around principle
- Reversibility signals: Paint, lightweight bollards, or temporary lane markings cost <10% of permanent infrastructure but signal flexibility
- Stakeholder engagement: Local government stakeholders (Westminster analogue) must have input into pilot design, not just deployment plans
- Evidence collection: Pilot allows empirical collection of data to address opposition claims (safety, traffic, access)
Sources:
- CS11 Website
- ScienceDirect: Effects of London Cycle Superhighways on Usage
- ScienceDirect: Safety Effects of London Cycle Superhighways
- Greater London Authority: Cycle Superhighway S11
- Camden New Journal: CS11 Opposition
Case 4: NYC Protected Bike Lanes (Post-Sadik-Khan Expansion)
Expansion Under Sadik-Khan (2007–2013)
- Total bike lanes installed: Nearly 400 miles system-wide
- Protected lanes: 120 miles (193 km) of protected/separated bike lanes installed
- Notable pilot: 9th Avenue protected bike lane (early high-profile installation)
Measured Outcomes (9th Avenue Pilot & Broader System)
- Safety: 47% reduction in injuries to all road users on 9th Avenue post-installation
- Economic: 49% increase in retail sales on 9th Avenue after bike lane introduction
- Ridership: >2x growth in bike share usage since 2007 infrastructure buildout
- Public support: 66% of New Yorkers support bike lanes (2010s baseline)
Post-Sadik-Khan Expansion
- De Blasio administration (2014–2019): Continued acceleration of protected lane installation
- Adams administration (2020–present): Pace of expansion declined; political headwinds from truck operators, some merchants
Governance Mechanism (Why Scaling Succeeded)
- Early high-profile pilots: 9th Avenue protected lane became proof-of-concept; data collection built confidence
- Measurable outcomes: Safety (47% injury reduction) and economic data (49% retail sales increase) provided strong political justification for city-wide rollout
- Incrementalism: Lanes added neighborhood by neighborhood, not in one comprehensive plan; easier to manage opposition
- Persistence through administrations: Despite initial opposition, safety data and ridership growth made reversing lanes politically costly
- Equity framing: Lanes connected to broader mobility justice and street safety agenda, not just cycling enthusiasm
Scaling Conditions
- Pilot-first, then rollout: 9th Avenue success preceded city-wide plan
- Continuous measurement: Quarterly reports on safety, usage, and economics maintained political support
- Incremental geography: New lanes by neighborhood; not city-wide mandate
- Labor/merchant engagement: Early outreach to truck operators and merchants addressed concerns; not all resolved, but managed
Challenges (Post-Scaling)
- Merchant opposition: Some merchants blamed lane reduction for street access losses (contested by TfL data)
- Truck driver opposition: Lanes reduced commercial vehicle movement; unions resisted
- Political susceptibility: Adams administration reversed some lanes due to pressure; suggests lack of deep political consensus (unlike Oslo, Barcelona)
Application to CAM Governance
- Pilot early, communicate results: 9th Avenue pilot + published safety data allowed confidence-building before city-wide rollout
- Incrementalism matters: Neighborhood-by-neighborhood approach is less politically contentious than city-wide plan
- Vulnerable to reversal: Without strong equity/health mandate (like Barcelona), infrastructure can be reversed if new political opposition emerges
- Labor & merchant engagement: CAM governance must address impact on parking attendants, delivery businesses, transportation workers; not ignore these constituencies
Sources:
- NYC DOT: 200-Mile Bike Lane Installation (2009)
- GSD Harvard: Janette Sadik-Khan on Bike-Friendly Cities
- Jalopnik: NYC First Protected Bike Lane
- CCNY: NYC Bike Program Analysis
Key Takeaway for Ch.8
Reversible pilots with clear success metrics scale better than imposed mandates. Oslo (28% traffic reduction, 75% support), Barcelona (700 deaths/year prevented, expanding to 500 blocks), and NYC 9th Avenue (47% injury reduction, 49% retail growth) all scaled because pilots generated credible outcome data. CS11 in London stalled because it skipped the reversible pilot phase, allowing opposition to crystallize around principle. CAM governance should require temporary pilots with specific metrics (e.g., “If CAM market share reaches X%, permanent curb reallocation will proceed”) before infrastructure commitment.